<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" version="2.0">
  <channel>
    <title>Articles</title>
    <link>https://www.temperhs.com/article</link>
    <description>articles</description>
    <language>en-us</language>
    <pubDate>Wed, 29 Apr 2026 11:57:54 GMT</pubDate>
    <dc:date>2026-04-29T11:57:54Z</dc:date>
    <dc:language>en-us</dc:language>
    <item>
      <title>Industrialised construction: component specialist cuts production time from 30 minutes to 40 seconds</title>
      <link>https://www.temperhs.com/article/industrialised-construction-component-specialist-cuts-production-time-from-30-minutes-to-40-seconds</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.temperhs.com/article/industrialised-construction-component-specialist-cuts-production-time-from-30-minutes-to-40-seconds" title="" class="hs-featured-image-link"&gt; &lt;img src="https://cp-catapult.s3.amazonaws.com/uploads/2026/04/2026-04-27-10.14.30_-1024x768.jpg" alt="Industrialised construction: component specialist cuts production time from 30 minutes to 40 seconds" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p style="line-height: 1.5;"&gt;“If we don’t automate, we’ll lose out to China,” says Sam Carver, the Managing Director of industrial parts manufacturer Magrenko, which is introducing new processes to speed the production of a specialist component used in ground engineering.&lt;br&gt;&lt;br&gt;Earlier this year, Magrenko took part in the&lt;a href="https://cp.catapult.org.uk/project/clean-futures/" style="text-decoration-line: underline; text-decoration-thickness: 0.05rem; color: #2e2d2b;"&gt;Clean Futures&lt;/a&gt;accelerator, delivered by Connected Places Catapult, to streamline the production of collet joints.&lt;br&gt;&lt;br&gt;These metal parts are used to connect together two sections of precast concrete foundation pile that support a range of new developments; from houses built on soft ground to large buildings including hospitals and prisons.&lt;br&gt;&lt;br&gt;The Wolverhampton-based company used £50,000 funding from the Clean Futures programme to invest in an automated manufacturing process and robotic equipment to speed up manufacturing and reduce costs by a third.&lt;br&gt;&lt;br&gt;Its new production line is set to go live in May, and will allow operations to continue throughout the night without human supervision during peaks in customer demand.&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.temperhs.com/article/industrialised-construction-component-specialist-cuts-production-time-from-30-minutes-to-40-seconds" title="" class="hs-featured-image-link"&gt; &lt;img src="https://cp-catapult.s3.amazonaws.com/uploads/2026/04/2026-04-27-10.14.30_-1024x768.jpg" alt="Industrialised construction: component specialist cuts production time from 30 minutes to 40 seconds" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p style="line-height: 1.5;"&gt;“If we don’t automate, we’ll lose out to China,” says Sam Carver, the Managing Director of industrial parts manufacturer Magrenko, which is introducing new processes to speed the production of a specialist component used in ground engineering.&lt;br&gt;&lt;br&gt;Earlier this year, Magrenko took part in the&lt;a href="https://cp.catapult.org.uk/project/clean-futures/" style="text-decoration-line: underline; text-decoration-thickness: 0.05rem; color: #2e2d2b;"&gt;Clean Futures&lt;/a&gt;accelerator, delivered by Connected Places Catapult, to streamline the production of collet joints.&lt;br&gt;&lt;br&gt;These metal parts are used to connect together two sections of precast concrete foundation pile that support a range of new developments; from houses built on soft ground to large buildings including hospitals and prisons.&lt;br&gt;&lt;br&gt;The Wolverhampton-based company used £50,000 funding from the Clean Futures programme to invest in an automated manufacturing process and robotic equipment to speed up manufacturing and reduce costs by a third.&lt;br&gt;&lt;br&gt;Its new production line is set to go live in May, and will allow operations to continue throughout the night without human supervision during peaks in customer demand.&lt;/p&gt;  
&lt;img src="https://track-eu1.hubspot.com/__ptq.gif?a=148334151&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fwww.temperhs.com%2Farticle%2Findustrialised-construction-component-specialist-cuts-production-time-from-30-minutes-to-40-seconds&amp;amp;bu=https%253A%252F%252Fwww.temperhs.com%252Farticle&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Wed, 29 Apr 2026 11:57:38 GMT</pubDate>
      <guid>https://www.temperhs.com/article/industrialised-construction-component-specialist-cuts-production-time-from-30-minutes-to-40-seconds</guid>
      <dc:date>2026-04-29T11:57:38Z</dc:date>
      <dc:creator>Adam</dc:creator>
    </item>
  </channel>
</rss>
